Empirical Analysis of the Relationship between Project Delivery Method on Project Performance in the Yemen Construction Industry

Authors

  • Fahd M. M. Nasser IQRA Business School, Geomatika University, Kuala Lumpur, Malaysia
  • Nahg Abdulmajid Alawi IQRA Business School, Geomatika University, Kuala Lumpur, Malaysia
  • Abaidullah M. IQRA Business School, Geomatika University, Kuala Lumpur, Malaysia
  • Asniza Yusuf IQRA Business School, Geomatika University, Kuala Lumpur, Malaysia

DOI:

https://doi.org/10.54536/ajebi.v3i1.2253

Keywords:

Yemen Construction Industry, Project Delivery Method, Project Performance, Project Managers, Consultants

Abstract

This empirical paper analyzed the relationship between project delivery methods on project performance within the Yemen construction industry (YCI). This research incorporated two distinct project delivery methods (PDM) namely the traditional Design-Bid-Build (DBB) and Design-Build (DB) and gauging project performance (PP) through the lens of the triple constraints (time, cost, and quality) as the criteria for measuring success. A conceptual model was theorized and operationalized in a survey of 375 project managers and consultants from two Yemeni governorates, Aden and Hadramout. The questionnaire employed a 5-point Likert Scale. Subsequently, the data were evaluated using multivariate regression. The empirical findings revealed a significant relationship between the choice of project delivery method and project performance. Thus, exerting a positive influence on project success. This study contributes to the existing body of knowledge in two significant ways. First, by scrutinizing the dynamic mechanisms through which project delivery methods impact project performance. Secondly, offers valuable insights for decision-makers in the Yemeni construction industry (YCI) to plan their objectives and achieve the requisite project performance levels.

Downloads

Download data is not yet available.

References

Al- Refaei, A. A. A. H., Ali, N. A. A. M. A., & Bahaj, A. M. H. A. (2021). An Investigation on the Impact of Training and Development on Service Quality in the Higher Education Sector. Journal of Critical Reviews, vol. 8(3), 250-260.

Allen Tadayon, O. Laedre, B. Andersen, O. Torp, N. Olsson, and J. Lohne. (2015). Selection criteria for delivery methods for infrastructure projects. Procedia Social and Behavioral Sciences, 226(1877), 260–268.

Al-Refaei, A. A. A. H., Zumrah, A. R., & Al-Shuhumi, S. R. A. (2019). The Effect of Organizational Commitment on Higher Education Services Quality. E-Journal on Integration of Knowledge (7th Edition).

Al-Refaei, A. H., Zumrah, A. B., Alsamawi, M. A., & Alshuhumi, S. R. (2019). A Multi-Group Analysis of the Effect of Organizational Commitment on Higher Education Services Quality. Journal of business society, 3(10), 40-48.

Al-Refaei, A. A.-A., Ali, H. B. M., Ateeq, A. A., Alzoraiki, M. (2023). An Integrated Mediating and Moderating Model to Improve Service Quality through Job Involvement, Job Satisfaction and organization commitment. Sustainability, 15, 78-79.

Alshuhumi, S. R., Al-Hidabi, D. A., & Al-Refaei, A. A. (2023). Unveiling the behavioral nexus of innovative organizational culture: Identification and affective commitment of teachers in primary schools. Journal of Human Behavior in the Social Environment, 30(3), 41–43.

Aragones-Beltran, P., Garcia-Melon, M., and MontesinosValera, J. (2017). How to assess stakeholders’ influence in project management A proposal based on the analytic network process. International Journal of Project Management, 35(3), 12.

Basel Sultan, & Kajewski, Stephen. (2003). The Yemen construction industry: reading in the industry for the successful implementation of sustainability. International conference on Smart and Sustainable Built Environment. Queensland University of Technology, Australia, Queensland, Brisbane, 1-9. Australia,

Carl J. Circo. (2020). Contract Theory and Contract Practice: Allocating Design Responsibility in the Construction Industry. Florida Law Review, 58(561), 44.

Chiguru, J. (2019). Factors affecting triple constraints in project management success: A case of unit Trust of Tanzania projects infrastructure development. Master. Dissertation. The Open University of Tanzania, Tanzania.

Cody N. Robertson. (2022). Early Contractor Involvement Construction Project Delivery Methodology for the US Navy. Defence Technical Information Centre. NAVFAC USA.

Demetracopoulou, V., O′Brien, W. J., Khwaja N. (2020). Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 12-13.

Drucker P. F. (1954). The practice of management. Harper & Row, New York, USA.

El Wardani, M. A., J. I. Messner, and M. J. Horman. (2006). Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132.

Fayomi, Fidelis Olukayode, Onifade, M. K. and Adeoye, A.B. (2023). Iron-triangle framework and the efficient management of public building projects in Nigeria. Journal-Innovations, (71), 12-14.

Francom T., Asmar, M. E., & Ariaratnam, S. T. (2014). Using alternative project delivery methods to enhance the cost performance of trenchless construction projects. In Construction Research Congress Construction in a Global Network, 14(12), 12-13.

Ghumiem, S. H., Alawi, N. A., Abd A-A, A. R., & Masaud, K. A. (2023). Corporate Culture and Its Effects on Organizational Performance: Multi-Group Analysis Evidence from Developing Countries. European Journal of Business and Management Research, 8(2), 142-148.

Ghumiem, S. H., & Alawi, N. A. M. (2022). The Effects of Organizational Commitment on Non-Financial Performance: Insights from Public Sector Context in Developing Countries. Journal of International Business and Management, 5(8), 01-13.

Gomes, J., Romão, M. (2016). Improving project success: A case study using benefits and project management. Procedia Computer Science, (100), 489–497.

Gordon CM. (1994). Choosing Appropriate Construction Contracting Method. Journal of Construction Engineering and Management, 120, 196-210.

Guangdong Wu, Xianbo Zhao, Jian Zuo and George Zillante. (2019). Effective of team diversity on project performance in construction projects. Engineering Construction & Architectural Management, 26(2), 7.

Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2019). Multivariate data analysis (Eighth Ed.). Cengage, Andover.

Hart, O. and Holmstrom, B. (1986). The Theory of Contracts. conference at the World Congress of the Econometric Society, Cambridge, Massachusetts, USA March. pp 75. https://aisel.aisnet.org/irwitpm.

Ibbs, W., Kwak, Y. H., Ng, T., Odabasi, M. (2003). Project delivery systems and project change: Quantitative Analysis.

Johan Larsson, Per Erik Eriksson, Thomas Olofsson. (2016). Leadership in Civil Engineering: Effects of Project Managers’ Leadership Styles on Project Performance. Journal of management in engineering, 32(4), 6.

John B. Miller, Michael J Garvin, C. William Ibbs, Stephen E. Mahoney. (2000). Toward a New Paradigm: Simultaneous Use of Multiple Project Delivery Methods. Journal of Management in Engineering, 16(3), 58-67.

Jugdev, K. and Müller, R. (2005). A retrospective look at our evolving understanding of project success. Project Management Journal, 36(4), 19–31.

Julien Pollack, Jane Helm, Daniel Adler. (2018). What is the Iron Triangle, and how has it changed? International Journal of Managing Projects in Business, 11(4), 7-9.

Kenneth J. Arrow (1962). The economic implications of learning by doing. The Review of Economic Studies, 29(3), 155-173.

Kline, R.B. (2016). Principles and Practice of Structural Equation Modelling. (4th Ed). The Guilford Press. New York, 2016, pp 36Liang, X., Yu, T., & Guo, L. (2017). Understanding Stakeholders’

Konchar, M., & Sanvido, V. (1998). Comparison of US project delivery systems. Journal of construction engineering and management, 124(6), 435-444.

Love, P.E.D., Skitmore, M. and Earl, G. (1998). Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), 22-33.

Mafakheri, F., Dai L., Slezak D., Nasiri F. (2007). Project delivery system selection under uncertainty: Multicriteria, multilevel decision aid model. Journal of Management in Engineering, 23(4), 22-25.

Main A, George M. (2012). The impact of type of construction contract on project time and cost performance in Kenya. A case study of traditional and integrated contracts. Master. Dissertation, Nairobi Univ.,

Mohammed Al Khalil. (2002). Selecting the appropriate project delivery method using AHP. International Journal of Project Management, 20(6), 469-474.

Nairobi, KenyaMehany, M. S. H. M., N. Grigg. (2018). Claims and project performance between traditional and alternative project delivery methods. Journal of Legal Affairs.

Najib Al-Fadhali, Ng Kim Soon, Rozlin Zainal, Abd Rahman Ahmad & Abdel Hafiz Ali Hasaballah. (2017). Influential Factors in Construction Industry of Yemen. Conference on Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate, Kuala Lumpur, December 19 -21. Malaysia.

Nilton Takagi, & Varajao, J. (2020). Success Management and the Project Management Body of Knowledge (PMBOK): An Integrated Perspective.of Construction Engineering and Management, 6(435), 33-34.

Osei-Kyei, R., Chan, A. P. C., Javed, A. A., & Ameyaw, E. E. (2017). “Critical success criteria for public-private partnership projects. International Journal of Strategic Property Management, 21(1), 1-2.

Project Delivery Methods in Construction Industry. International Journal of chain management, 7(6), 178-180.

Qingping Zhong, Hui Tang & Chuan Chen. (2022). A Framework for Selecting Construction Project Delivery Method Using Design Structure Matrix. Buildings, 12(4), 36-42.

Ralf Muller, J. Rodney Turner. (2005). The impact of principal–agent relationship and contract type on communication between project owner and manager. International Journal of Project Management, 23(5), 398-403.

Sahibzada, U. F., Jianfeng, C., Latif, F., & Shafait, Z.(2019). Development and Validation of a Multidimensional Instrument for Measuring Internal Marketing in Chinese Higher Education.

Salma Ahmed & El-Sayegh. (2012). Critical Review of the Evolution of Project Delivery Methods in the Construction Industry. Buildings, 11(11), 1-2.

Sinem Mollaoglu-Korkmaz, Lipika Swarup, David Riley. (2013). Delivering Sustainable, High-Performance Buildings: Influence of Project Delivery Methods on Integration and Project Outcomes. Journal of Management in Engineering, 29(1), 71-78.

Stephen O. Ojo. (2009). Benchmarking the Performance of construction Procurement Methods against Selection Criteria in Nigeria. Civil Engineering Dimension, 11(2), 32-35.

Syed Z. Zuber, M. N. Mohd Nawi, F. A. Abdul Nifa, A. Y. Bahaudin. (2018). An Overview of Systems, International Research Workshop on IT Project Management.

USA. International association of project managers. theory of contracts to design and manage donor funded projects. Liechtenstein, IAPM, (2023). https://www.iapm.net/en/blog/theory-of-contracts-in-donor-funded-projects/.

Wateridge, J. (1989). How can IS/IT projects be measured for success. International Journal of Project Management, 16(1), 59–63.

Yong Q. Chen, Liu J. Y., Li B., Lin B. (2011). Project delivery system selection of construction projects in China. Expert Systems with Applications, 38(5), 5456-5462.

Zumrah, A. R. (2019). The Effect of Affective Commitment of Non-Academic Staff on Services Quality in Higher Education Sector. E-Proceeding of the 5 World Conference on Integration of Knowledge. Available at https://dx.doi.org/10.2139/ssrn.4187788

Zumrah, A. R. B., Bahaj, M. H. A., & Alrefai, A. S. (2021). An Empirical Investigation of the Effect of Training and Development on Organizational Commitment in Higher Education Sector. Journal of International Business and Management, (3), 230-238.

Downloads

Published

2023-12-18

How to Cite

Nasser, F. M. M., Alawi, N. A., M, A., & Yusuf, A. (2023). Empirical Analysis of the Relationship between Project Delivery Method on Project Performance in the Yemen Construction Industry. American Journal of Economics and Business Innovation, 3(1), 1–8. https://doi.org/10.54536/ajebi.v3i1.2253