Integrated Inventory Model for Multi Item under Price - Sensitive Demand with Controllable Lead Time and Greenhouse Gas Emission Effect on Production andTransportation

Authors

  • Neetu Rawat Department of Mathematics, H S B Government PG College , Someshwar, Almora, Uttarakhand-263637 India, India
  • Rakesh Pandey Department of Mathematics, H S B Government PG College , Someshwar, Almora, Uttarakhand-263637 India, India

DOI:

https://doi.org/10.54536/ajise.v5i2.7091

Keywords:

Greenhouse Gas Effect, Integrated Inventory Model, Lead Time, Multi Items, Price Sensitive Demand

Abstract

In today’s era of rapid human advancement, environmental concerns have become just as important as economic and industrial growth. This study examines how greenhouse gas (GHG) emissions affect production and transportation in a supply chain model in which a single vendor supplies multiple items to several buyers. The buyers’ demand is normally distributed, and delivery lead times can be shortened by incurring crash costs. Importantly, the model also incorporates transportation and GHG-related costs during both production and delivery stages. Additionally, the model considers price-sensitive demand, recognizing that fluctuations in price can influence buyer behavior and overall demand levels. The main goal is to minimize the overall expected cost while determining key decision variables, such as each buyer’s lead time, the vendor’s order quantities, and shipment frequency. A numerical example is used to illustrate the model, and a sensitivity analysis explores how changes in key parameters affect the optimal supply chain decisions.

Downloads

Download data is not yet available.

References

Adhikary, A., Sharma, A., Diatha, K. S., & Jayaram, J. (2020). Impact of buyer-supplier network complexity on firms’ greenhouse gas (GHG) emissions: An empirical investigation. International Journal of Production Economics, 230, 107864. https://doi.org/10.1016/j.ijpe.2020.107864

Aritonang, K., Nainggolan, M., & Djunaidi, A. V. (2020). Integrated Supply Chain for a single vendor and multiple buyers and products with crashing lead time. International Journal of Technology, 11(3), 642. https://doi.org/10.14716/ijtech.v11i3.3750

Banerjee, A. (1986). A joint economic‐lot‐size model for purchaser and vendor. Decision sciences, 17(3), 292–311. https://doi.org/10.1111/j.1540-5915.1986.tb00228.x

Banerjee, A., & Banerjee, S. (1994). A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. International Journal of Production Economics, 35(1–3), 85–91. https://doi.org/10.1016/0925-5273(94)90068-x

Castellano, D., Gallo, M., Grassi, A., & Santillo, L. C. (2019). The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain. International Journal of Production Economics, 218, 30–42. https://doi.org/10.1016/j.ijpe.2019.04.010

Chowdhury, M. H., Ahmed, T., Rahman, M. B., & Islam, A. H. M. S. (2023). Smart Inventory management system with forecasting technique applied to efficiently handle industrial Asset. American Journal of Innovation in Science and Engineering, 2(2), 1–5. https:// doi.org/10.54536/ajise.v2i2.1384

Dash, A., Giri, B. C., & Sarkar, A. K. (2023). Coordination of a single-manufacturer multi-retailer supply chain with price and green sensitive demand under stochastic lead time. Decision Making. Applications in Management and Engineering/Decision Making: Applications in Management and Engineering, 6(1), 679–715. https://doi.org/10.31181/dmame0319102022d

Giri, B., Dash, A., Sarkar, A. (2020). A Single-manufacturer multi-retailer integrated inventory model with price dependent demand and stochastic lead time. International Journal of Supply and Operations Management,7(4), 384-409. https://doi.org/10.31181/dmame0319102022d

Glock, C. H., & Kim, T. (2015). Coordinating a supply chain with a heterogeneous vehicle fleet under greenhouse gas emissions. International Journal of Logistics Management/the International Journal of Logistics Management, 26(3), 494–516. https://doi.org/10.1108/ijlm-09-2013-0107

Goyal, S. K. (1988). “A joint economic‐lot‐size model for purchaser and vendor”: A Comment*. Decision Sciences, 19(1), 236–241. https://doi.org/10.1111/j.1540-5915.1988.tb00264.x

Hoque, M. (2011). An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. European Journal of Operational Research, 215(1), 80–88. https://doi.org/10.1016/j.ejor.2011.05.036

Hoque, M. (2013). A manufacturer–buyer integrated inventory model with stochastic lead times for delivering equal- and/or unequal-sized batches of a lot. Computers & Operations Research, 40(11), 2740–2751. https://doi.org/10.1016/j.cor.2013.05.008

Hoque, M. A., & Goyal, S. K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102(2), 217–225. https://doi.org/10.1016/j.ijpe.2005.02.012

Hoque, M., & Goyal, S. (2000). An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65(3), 305–315. https://doi.org/10.1016/s0925-5273(99)00082-1

Hsiao, Y. (2008). Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. International Journal of Production Economics, 115(1), 229–235. https://doi.org/10.1016/j.ijpe.2008.06.004

Jha, J., & Shanker, K. (2013). A coordinated two-phase approach for operational decisions with vehicle routing in a single-vendor multi-buyer system. International Journal of Production Research, 51(5), 1426–1450. https://doi.org/10.1080/00207543.2012.693962

Jha, J., & Shanker, K. (2013). Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Applied Mathematical Modelling, 37(4), 1753–1767. https://doi.org/10.1016/j.apm.2012.04.042

Kurdhi, N. A., Yuliana, N., & Suratno, B. (2021). Integrated production inventory routing planning for vendor-buyers coordination supply chain with probabilistic demand, unstable lead time, setup cost reduction, service level consideration. International Journal of Revenue Management, 12(3/4), 258. https://doi.org/10.1504/ijrm.2021.120365

Liao, C., & Shyu, C. (1991). An analytical determination of lead time with normal demand. International Journal of Operations & Production Management, 11(9), 72–78. https://doi.org/10.1108/eum0000000001287

Lin, L., Chen, L., & Hsiao, Y. (2011). A note on a study of an integrated inventory with controllable lead time. International Journal of Production Research, 49(15), 4727–4733. https://doi.org/10.1080/00207543.2010.501349

Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81(2), 312–323. https://doi.org/10.1016/0377-2217(93)e0253-t

Marchi, B., Zanoni, S., Zavanella, L., & Jaber, M. (2019). Supply chain models with greenhouse gases emissions, energy usage, imperfect process under different coordination decisions. International Journal of Production Economics, 211, 145–153. https://doi.org/10.1016/j.ijpe.2019.01.017

Noh, J., & Kim, J. S. (2019). Cooperative green supply chain management with greenhouse gas emissions and fuzzy demand. Journal of Cleaner Production, 208, 1421–1435. https://doi.org/10.1016/j.jclepro.2018.10.124

Ogunleye, T., Mogbojuri, A., & Adeyeye, A. (2022).Nonpre-emptive integer nonlinear goal programming model for multi-item inventory problem: case study of a car retail centre in lagos state. American Journal of Multidisciplinary Research and Innovation, 1(2), 51–55. https://doi.org/10.54536/ajmri.v1i2.260

Pan, J. C., & Yang, J. (2002). A study of an integrated inventory with controllable lead time. International Journal of Production Research, 40(5), 1263–1273. https://doi.org/10.1080/00207540110105680

Sarmah, S., Acharya, D., & Goyal, S. (2008). Coordination of a single-manufacturer/multi-buyer supply chain with credit option. International Journal of Production Economics, 111(2), 676–685. https://doi.org/10.1016/j.ijpe.2007.04.003

Suef, M., Jauhari, W. A., Pujawan, I. N., & Dwicahyani, A. R. (2023). Investigating carbon emissions in a single-manufacturer multi-retailer system with stochastic demand and hybrid production facilities. Process Integration and Optimization for Sustainability, 7(4), 743–764. https://doi.org/10.1007/s41660-023-00320-3

Vijayashree, M., & Uthayakumar, R. (2015). Integrated inventory model with controllable lead time involving investment for quality improvement in supply chain system. Directory of Open Access Journals. https://doi.org/10.22034/2015.1.05

Downloads

Published

2026-05-11

How to Cite

Rawat, N. ., & Pandey, R. . (2026). Integrated Inventory Model for Multi Item under Price - Sensitive Demand with Controllable Lead Time and Greenhouse Gas Emission Effect on Production andTransportation. American Journal of Innovation in Science and Engineering , 5(2), 21-33. https://doi.org/10.54536/ajise.v5i2.7091