“Post-Fire Structural Condition Assessment and Remediation Strategy for a Seven-Storied Reinforced Concrete Industrial Building: A Case Study from the Ready-Made Garment Sector in Bangladesh”. International Journal of Architecture, Construction and Renovation, vol. 1, no. 1, Sept. 2026, pp. 1-8, https://doi.org/10.54536/ijacr.v1i1.8295.