[1]
“Post-Fire Structural Condition Assessment and Remediation Strategy for a Seven-Storied Reinforced Concrete Industrial Building: A Case Study from the Ready-Made Garment Sector in Bangladesh”, IJACR, vol. 1, no. 1, pp. 1–8, Sep. 2026, doi: 10.54536/ijacr.v1i1.8295.