(1)
Post-Fire Structural Condition Assessment and Remediation Strategy for a Seven-Storied Reinforced Concrete Industrial Building: A Case Study from the Ready-MadeĀ Garment Sector in Bangladesh. IJACR 2026, 1 (1), 1-8. https://doi.org/10.54536/ijacr.v1i1.8295.