[1]
2026. Post-Fire Structural Condition Assessment and Remediation Strategy for a Seven-Storied Reinforced Concrete Industrial Building: A Case Study from the Ready-Made Garment Sector in Bangladesh. International Journal of Architecture, Construction and Renovation. 1, 1 (Sep. 2026), 1–8. DOI:https://doi.org/10.54536/ijacr.v1i1.8295.