Jany, M.R. (2026) “A Proposed UAV-BIM-Integrated Earned Value Management Framework with a Climate-Adjusted Schedule Performance Index for High-Rise Construction Project Control: A Conceptual Framework and Illustrative Demonstration”, American Journal of Civil Engineering and Constructions, 2(2), pp. 45–58. doi:10.54536/ajcec.v2i2.8387.