Jany, M. R. ., Shirin, M. S. ., Islam, S. ., Nimeri, N. ., Neloy, A. H. ., Karim, R. ., & Jami, R. H. . (2026). A Proposed UAV-BIM-Integrated Earned Value Management Framework with a Climate-Adjusted Schedule Performance Index for High-Rise Construction Project Control: A Conceptual Framework and Illustrative Demonstration. American Journal of Civil Engineering and Constructions, 2(2), 45-58. https://doi.org/10.54536/ajcec.v2i2.8387