[1]
Jany, M.R. et al. 2026. A Proposed UAV-BIM-Integrated Earned Value Management Framework with a Climate-Adjusted Schedule Performance Index for High-Rise Construction Project Control: A Conceptual Framework and Illustrative Demonstration. American Journal of Civil Engineering and Constructions. 2, 2 (Sep. 2026), 45–58. DOI:https://doi.org/10.54536/ajcec.v2i2.8387.